Aspen Project Jaynes was selected to assist Aristocrat Technologies with their 52,000 SF tenant improvement project at their Birtcher facility. The design build project includes select demolition, upgrading the electrical and HVAC systems, and the creation of new office and lab areas.
Owner: Aristocrat Technologies
|
Las Vegas, NV
|
|
|
|
 |
 |

|
|
Bloomfield, NM
|
September 2008
|
|
|
 |
 |

|
City of Las Cruces Administration Building Multi story LEED certified facility that will allow the City of Las Cruces to consolidate various departments into one centralized location.
Owner: City of Las Cruces
|
Las Cruces, NM
|
November 2009
|
|
|
 |
 |

|
Coca Cola Addition & Remodel Demo of a portion of the existing building and addition of new metal building, and parking lot revisions.
Owner: Coca Cola Bottling Company
|
Farmington, NM
|
August 2008
|
|
|
 |
 |

|
Cox Communications Tenant Improvement Jaynes was selected to do this 186,000 SF demolition and tenant improvement project. The demolition has been completed and the mechanical and electrical rough-in is in progress.The former two story VA medical center will be transformed into a state of the art operations center for Cox Communications.
Read More
Owner: Cox Communications
|
Las Vegas, NV
|
August 2008
|
|
|
 |
 |

|
Deer Springs Town Center The Deer Springs Town Center site development project was awarded to Jaynes Corporation in January 08. The 60 acre project consists of earthwork, utilities, asphalt paving, site concrete, retaining walls and site lighting. This regional shopping center will be anchored by Home Depot and Target. Read More
Owner: Regency Center
|
North Las Vegas, NV
|
October 2008
|
|
|
 |
 |

|
Del Rio Elementary Construction of a steel stud 1-story buildings, modernization of existing multipurpose/kitchen building, relocation of restroom building, demolition of existing structures, construction of a new entry from North River Road and relevant site work.
Owner: Oceanside Unified School District
|
Oceanside, CA
|
February 2010
|
|
|
 |
 |

|
Grossmont Hospital Care Unit 67,000 SF OSHPD project consisting of the build-out of 3 stories of an existing 5-story hospital. Read More
Owner: Grossmont Healthcare District
|
La Mesa, CA
|
January 2009
|
|
|
 |
 |

|
|
Albuquerque, NM
|
July 2008
|
|
|
 |
 |

|
Navajo Preparatory School Phase III Jaynes is currently working on the first part of Phase III which is constructing baseball, softball, and football fields, with irrigation systems, a running track and a restroom building. Phase III will eventually include a dormitory, student union, and fine arts building. Total sf is approx 10,200 Read More
Owner: Navajo Preparatory School
|
Farmington, NM
|
|
|
|
 |
 |

|
|
Farmington, NM
|
December 2008
|
|
|
 |
 |

|
Sandia Casino Renovation The remodel of 7 areas of the existing facility.
Owner: Sandia Resort & Casino
|
Albuquerque, NM
|
August 2008
|
|
|
 |
 |

|
Santa Fe Wal-Mart Road Work Grade Herrera road and install one 36 culvert with two drop inlets.
Owner: Wal-Mart
|
Santa Fe, NM
|
October 2008
|
|
|
 |
 |

|
Skills Center at Educational Cultural Complex Reflecting the original design and with respect to the neighborhood, this addition continues the current park-like feel of the existing structure and site, breathing new life into an area of town that has experienced few opportunities for growth. Read More
Owner: San Diego Community College District
|
San Diego, CA
|
October 2008
|
|
|
 |
 |

|
Southwest Gas Operations Center Jaynes Corporation has been awarded a $10.8 million contract to construct the Southwest Gas Corporation’s new facility in Henderson. The Southeast Operations Center will be built on a 16 acre site located south of St Rose Parkway and east of the Henderson Airport. The project includes the construction of a 58,000 square foot concrete tilt up office/warehouse facility, a 14,000 square foot fabrication shop, and a sixteen building training facility complex as well as the construction of the streets and utilities to support the operations center. The training facility includes sixteen mock-up buildings and an open excavation area used to train employees. The buildings, built to look like homes, apartments and businesses are laid out to resemble city streets and neighborhoods. These buildings will allow SW Gas employees to train in a more realistic environment. The project is scheduled to be completed in early June of 2009.
Owner: SW Gas
|
Henderson, NV
|
June 2009
|
|
|
 |
 |

|
US Army Reserve Center & Unit Storage Building This Design/Build project includes demolition of existing structures and new construction of a 60,000 SF steel framed building and 24,000 SF pre-engineered metal building with exterior masonry walls.
Owner: US Army Corps of Engineers
|
Garden Grove, CA
|
|
|
|
 |
 |
|
|
|