|
|
V. Sue Cleveland High School
Albuquerque | Jaynes Corp | Education, Public Facilities
V. Sue Cleveland High School is the newest high school in northern Rio Rancho. 
|
|
|
Deer Springs Town Center
Las Vegas | Jaynes Corp | Site Development
The Deer Springs Town Center site development project was awarded to Jaynes Corporation in January 08. The 60 acre project… 
|
|
|
Murrieta City Hall
San Diego | Jaynes Corp | Public Facilities
This project consists of constructing a new 33,678 SF 2-Story building with 120 seat City Council chamber, more than 100… 
|
|
|
UCSD Robert Paine Scripps Center for Oceanography
San Diego | Jaynes Corp | Office & Lab
UCSD Robert Paine Scripps Center, a 19,000 SF complex located just south of Scripps Pier in La Jolla. 
|
|
|
Canyon Crossings
San Diego | Jaynes Corp | Retail
Canyon Crossings will be a vibrant, pedestrian-friendly place with a mixture of large scale retail, specialty stores, sit-down restaurants, cafes… 
|
|
|
XTO Crouch Mesa
Farmington | Jaynes Corp | Public Facilities
This project consists of 4 new buildings totaling 123,000 sf, and a 40 acre site development. The two main buildings… 
|
|
|
|
|
|

|
Aspen Project Jaynes was selected to assist Aristocrat Technologies with their 52,000 SF tenant improvement project at their Birtcher facility. The design build project includes select demolition, upgrading the electrical and HVAC systems, and the creation of new office and lab areas.
Owner: Aristocrat Technologies
|
Las Vegas, NV
|
|
|
|
 |
 |

|
|
Bloomfield, NM
|
September 2008
|
|
|
 |
 |

|
Canyon Crossings Canyon Crossings will be a vibrant, pedestrian-friendly place with a mixture of large scale retail, specialty stores, sit-down restaurants, cafes and quick-service restaurants.
Read More
Owner: Transcan Development, LLC
|
Riverside, CA
|
September 2007
|
|
|
 |
 |

|
City of Las Cruces Administration Building Multi story LEED certified facility that will allow the City of Las Cruces to consolidate various departments into one centralized location.
Owner: City of Las Cruces
|
Las Cruces, NM
|
November 2009
|
|
|
 |
 |

|
Coca Cola Addition & Remodel Demo of a portion of the existing building and addition of new metal building, and parking lot revisions.
Owner: Coca Cola Bottling Company
|
Farmington, NM
|
August 2008
|
|
|
 |
 |

|
Cox Communications Tenant Improvement Jaynes was selected to do this 186,000 SF demolition and tenant improvement project. The demolition was been completed and the mechanical and electrical rough in is in progress.The former two story VA medical center will be transformed into a state of the art operations center for Cox Communications.
Read More
Owner: Cox Communications
|
Las Vegas, NV
|
|
|
|
 |
 |

|
Deer Springs Town Center The Deer Springs Town Center site development project was awarded to Jaynes Corporation in January 08. The 60 acre project consists of earthwork, utilities, asphalt paving, site concrete, retaining walls and site lighting. This regional shopping center will be anchored by Home Depot and Target. Read More
Owner: Regency Center
|
North Las Vegas, NV
|
October 2008
|
|
|
 |
 |

|
Grossmont Hospital Addition The 67,000 SF project consists of the build out of three stories of an existing five-story hospital. Read More
Owner: Grossmont Healthcare District
|
San Diego, CA
|
January 2009
|
|
|
 |
 |

|
Murrieta City Hall This project consists of constructing a new 33,678 SF 2-Story building with 120 seat City Council chamber, more than 100 offices, expanded lobby and front counters. Read More
Owner: City of Murrieta
|
Murrieta, CA
|
November 2007
|
|
|
 |
 |

|
|
Albuquerque, NM
|
July 2008
|
|
|
 |
 |

|
Navajo Preparatory School Phase III Jaynes is currently working on the first part of Phase III which is constructing baseball, softball, and football fields, with irrigation systems, a running track and a restroom building. Phase III will eventually include a dormitory, student union, and fine arts building. Total sf is approx 10,200
Owner: Navajo Preparatory School
|
Farmington, NM
|
|
|
|
 |
 |

|
New Mexico Tri-Services Laboratory The New Mexico Tri-Services Laboratory (Tri-Lab) is a state-of-the art, multi-agency facility will house the State Department of Health’s Scientific Laboratory
Division, the Office of the Medical Investigator and the Department of Agriculture Veterinary Diagnostics Services Office.
|
Albuquerque, NM
|
May 2010
|
|
|
 |
 |

|
Oceanside Marketplace & Business Center Oceanside Marketplace and Business Center is a 67,000 SF mixed-use retail center located on the southeast corner of Oceanside Boulevard and Arroyo Avenue. Read More
Owner: Oceanside Marketplace & Business Center, LLC
|
Oceanside, CA
|
March 2008
|
|
|
 |
 |

|
San Jose Parish Church Demo existing building and construct new church.
Owner: Arhdioceses of Santa Fe
|
Albuquerque, NM
|
October 2008
|
|
|
 |
 |

|
|
Farmington, NM
|
December 2008
|
|
|
 |
 |

|
Sandia Casino Renovation The remodel of 7 areas of the existing facility.
Owner: Sandia Resort & Casino
|
Albuquerque, NM
|
August 2008
|
|
|
 |
 |

|
Santa Fe Wal-Mart Road Work Grade Herrera road and install one 36 culvert with two drop inlets.
Owner: Wal-Mart
|
Santa Fe, NM
|
October 2008
|
|
|
 |
 |

|
Southwest Gas Operations Center Jaynes Corporation has been awarded a $10.8 million contract to construct the Southwest Gas Corporation’s new facility in Henderson. The Southeast Operations Center will be built on a 16 acre site located south of St Rose Parkway and east of the Henderson Airport. The project includes the construction of a 58,000 square foot concrete tilt up office/warehouse facility, a 14,000 square foot fabrication shop, and a sixteen building training facility complex as well as the construction of the streets and utilities to support the operations center. The training facility includes sixteen mock-up buildings and an open excavation area used to train employees. The buildings, built to look like homes, apartments and businesses are laid out to resemble city streets and neighborhoods. These buildings will allow SW Gas employees to train in a more realistic environment. The project is scheduled to be completed in early June of 2009.
Owner: SW Gas
|
Henderson, NV
|
June 2009
|
|
|
 |
 |

|
XTO Crouch Mesa This project consists of 4 new buildings totaling 123,000 sf, and a 40 acre site development. The two main buildings (totaling 78,000 sf) will house 130 offices with enough shelled space to add 60 additional offices. There are also numerous conference rooms, break rooms, and file rooms. Read More
Owner: XTO Energy
|
Farmington, NM
|
|
|
|
 |
 |
|
|
|