![]() |
||||
|
||||||||||||||||||||||||||||||||
Conoco Phillips Office Building |
||||||||||||||||||||||||||||||||
|
Location: Farmington Owner: Conoco Phillips Completion Date: December 2011
New two-story office building |
||||||||||||||||||||||||||||||||
|
Farmington | Jaynes Corp | Office & Lab The ConocoPhillips project consists of a new 25,884 square foot two story office building added to the existing ConocoPhillips campus. The building sits on 47EA auger cast piles and ties into a cast in place foundation system consisting of pile caps, grade beams, and stem walls. The main structure consists of structural steel columns, beams and joists. There is a slab on metal deck on the 2nd floor and roof. The exterior consists of structural metal studs, exterior sheathing, and EIFS. There is an elevator and interior stairway for access to the 2nd floor offices. There is also an interior 3 story stairway on the south side of the bldg that will serve as the main entrance for most of the Conoco Phillips employees working in the bldg that will access the 1st floor, 2nd floor, and roof levels. There are 2EA main 4000cfm rooftop units that serve the 1st and second floors of this office bldg. There are 12 terminal units per floor to aide in the temperature control for each floor. There is a boiler in a penthouse on the roof that supports the terminal units on the 1st and 2nd floors. |
||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||