BIM and VDC At Jaynes: Driving Construction Innovation

May 13, 2025

Precision, collaboration, and planning are more than buzzwords in commercial construction—they’re non-negotiables. At the heart of these values are two of the most transformative forces in the industry today: Building Information Modeling (BIM) and Virtual Design and Construction (VDC).

At Jaynes, the BIM/VDC team isn’t simply another internal department; they’re the digital visionaries behind our physical builds, turning complex tasks and construction logistics into coordinated realities.

Why BIM and VDC Matter

Today, BIM isn’t simply 3D modeling—it’s part of a process that integrates every phase of a building’s life cycle, from conceptual design and preconstruction through construction, project completion, and facilities management. BIM allows for real-time collaboration among architects, engineers, and construction professionals, using a centralized digital model that evolves with the project. It streamlines coordination, reduces risk, improves cost predictability, and enables faster decision-making.

The Jaynes BIM/VDC team consists of designers, modelers, and VDC Specialists who combine technical expertise with field knowledge to help make project delivery at Jaynes more efficient. Joe Hawkins oversees this initiative.

Meet Joe Hawkins, Jaynes BIM/VDC Director

Connect with Joe Hawkins on LinkedIn.

Joe leads the Jaynes BIM/VDC team. With over 14 years of experience at Jaynes, Joe manages and implements VDC initiatives, including project execution, strategy, and BIM process improvements. He also performs the required research on new technologies that his team tests and may use. His main focus is building systems integration and coordination during preconstruction and construction.

With an architectural background, Joe is keenly interested in Design-Assist environments, such as Design-Build procurement processes that link design and construction installation. “Our goal isn’t just to model projects—it’s to anticipate problems before they happen,” he explains. “We’re trying to think ahead so our Superintendents and Project Managers can plan and build with their subcontractors without surprises or mistakes.”

Quick Q & A With Jaynes’ Director of BIM/VDC Joe Hawkins

Q: How does Jaynes use BIM and VDC in the construction process today?

A: BIM and VDC aren’t just tools—we see them as strategic workflows that align teams, reduce risk, and accelerate delivery. For Jaynes, it’s about building smarter, not just modeling in 3D. The model becomes a single source of truth that helps everyone, from design through closeout, stay coordinated and informed.

Q: Your team works across design, preconstruction, and field. What’s the key to that collaboration?

A: Communication. We invest a lot of time in training and building trust. We aim for superintendents to feel just as comfortable with the model as our BIM/VDC Specialists. When that happens, adoption skyrockets—and so does productivity.

Q: What technologies are you most excited about right now?

A:  3D scanning and reality capture are changing the game. We’re also exploring AI-assisted clash detection and robotic layout. But it’s not just about the tech—it’s about implementation. The best tools are the ones the teams use

Q: What advice would you give to someone starting in VDC?

A:  Learn the language of construction. Understand how buildings go together. The tech will keep changing, but if you can speak to superintendents, architects, and Owners in terms they understand, you’ll be a bridge—and that’s where the real value is.

Q: You established the BIM/VDC team at Jaynes over 13 years ago. What’s something you’re proud of since then?

A: Seeing our junior VDC team members walk into a job trailer and get treated like leaders. That tells me we’re not just building a process—we’re building people. And that’s what makes this work meaningful.

The Practical Value of BIM and VDC

An advantage of BIM and VDC is that the technologies can connect the team at the project site with the office. Through laptops, tablets, and cell phones, the models created in the office are accessible to crews on-site in real time.

The Jaynes BIM/VDC team collaborates closely with Superintendents and subcontractors, ensuring everyone, from steel fabricators to electricians, has the most up-to-date information. When field teams encounter unexpected conditions, changes can be rapidly modeled and coordinated digitally before work resumes.

“Our job is to support the field team’s progress,” says Joe. “Construction doesn’t wait. So we build in the virtual world first to remove as much friction on site as possible.”

Jaynes BIM/VDC Project Highlights

Jaynes Corporation has effectively leveraged BIM and VDC across various complex projects, enhancing coordination, reducing risks, and accelerating project delivery for Owners. Here are some key projects Jaynes BIM/VDC Director Joe Hawkins highlights where BIM played a pivotal role:​

Jaynes built Presbyterian’s 10-story, 135-foot tower with 656 patient rooms.

Presbyterian Hospital Renovation & Addition

In renovating and expanding the 111-year-old Presbyterian Hospital, Jaynes faced challenges such as complex systems integration, structural constraints, and tight schedules. By employing BIM, they efficiently managed design coordination, infrastructure upgrades, and issue tracking. BIM helped improve forecasting, reduce bottlenecks, and led to a successful project delivery. Jaynes created 335,000 square feet, in 10 stories, for over 650 new patient rooms.

Jaynes built this 28,000 SF Design-Build project with Studio Southwest.

Sandia Resort & Casino Office Complex

Jaynes’ Pueblo of Sandia spans decades and allows for efficient communication between the Owner, Studio Southwest Architects, and the Jaynes project team. Using 3D scanning technology to scan the existing space before any work was done we overlaid engineering files with our scanned data and found that the proposed radius was off. Using the scanned data to correct the error, we were able to eliminate issues throughout the remainder of that portion of the project scope. This Design-Build project involved a 28,000 square foot, 2-story office complex adjacent to the operational casino. Jaynes collaborated with Studio Southwest.

Jaynes built 207,000 SF of new facilities and 60,000 SF of renovated space.

Farmington High School

In the development of Farmington High School, Jaynes employed BIM to facilitate clash detection and system coordination. This proactive approach minimized design conflicts and streamlined construction, contributing to the timely completion of the educational facility. ​In this multi-phased CMAR venture with FBT Architects, Jaynes built 207,000 square feet of new educational and athletic facilities and renovated 60,000 square feet of existing facilities.

Jaynes Accelerates Collaboration With BIM/VDC

BIM isn’t siloed at Jaynes; it’s embedded in every project phase. The team partners closely with preconstruction, estimating, safety, and operations to ensure alignment from day one.

The BIM team also works directly with Owners, helping them visualize design concepts, explore options, and plan future facility maintenance with data-rich models extending past ribbon-cutting.

And this collaborative spirit extends to external partners as well. Subcontractors are brought into the process early, giving them a seat at the table and a voice in model coordination. “It’s about building trust,” Joe notes. “When everyone’s on the same page, the whole project benefits.”

For more information on what BIM and Jaynes can do for you on your next project, contact us, and we’ll have one of our BIM experts follow up with you.

Connect with Joe Hawkins, Jaynes Director of BIM/VDC, on LinkedIn.

RECENT INSIGHTS
Building More Than Structures: Jaynes Supports Eddy County CASA’s Project Playhouse
June 18, 2026
Read more

Insights

Eight decades of building taught us what matters. Read the stories, strategies, and lessons that shaped Jaynes and continue to drive the construction industry forward.
Building More Than Structures: Jaynes Supports Eddy County CASA’s Project Playhouse
June 18, 2026
Christus St. Vincent Regional Cancer Center Earns the 2026 AGC New Mexico Best Buildings Grand Prize
June 2, 2026
Jaynes Jumps 52 Spots On ENR’s Top 400
May 27, 2026
Building Opportunity: Jaynes Helps Create Career Pathways in Albuquerque
May 14, 2026
Jaynes’ Safety Outreach Tour ’26: 100 Days of Summer & Reinforcing That Safety Brings You Home
May 7, 2026
Jaynes Observes Construction Safety Week: A Conversation with Woody Harwell On Safety, Accountability, and the Human Side of Risk
May 6, 2026
Observing Construction Safety Week 2026: Evolving A Culture Of Safety At Jaynes
May 5, 2026
Building Community Through Purpose: Jaynes Supports Deaf Entrepreneurs at PAH! Hiland Plaza
April 30, 2026
Showing Up When It Counts: The Jaynes Way
April 29, 2026
Jaynes Wins AGC NM Best Buildings Award for City of Albuquerque’s Southwest Public Safety Center
April 24, 2026
Jaynes’ Carlsbad High School Performing Arts Center Project Earns AGC New Mexico Best Buildings Honor
April 23, 2026
Building More Than a School: How Jaynes is Strengthening Community in Dolores, Colorado
April 13, 2026
Ari Garay, Jaynes Federal Group Project Engineer Intern, Wins Prestigious AGC Scholarship
October 9, 2025
Jaynes In The Community: Six Recent Major Education Projects Delivered
October 9, 2025
Jaynes In The Community: Six Major Education Projects Delivered in Summer 2025
September 24, 2025
The Jaynes Employee Spotlight: Miguel Almeida
August 12, 2025
The Washington Post Ranks Albuquerque International Sunport as 7th Best: A Moment of Pride for Jaynes
August 7, 2025
Jaynes Millwork At The Albuquerque International Sunport
August 4, 2025
Jaynes Wins Multiple AGC NM Best Buildings Awards
June 25, 2025
Employee Health and Well-Being: Jaynes Builds Strength On and Off the Jobsite
June 24, 2025
Jaynes Kicks Off 100 Days of Summer
June 12, 2025
BIM and VDC At Jaynes: Driving Construction Innovation
May 13, 2025
The Chief Risk Officer’s Role at Jaynes
May 9, 2025
Construction Safety Week Interview with Travis Massegee, Jaynes Corporate Safety Director
May 8, 2025
Jaynes Corporation Wins Prestigious 2025 Associated General Contractors of America Construction Safety Excellence Award
April 22, 2025
Jaynes Millwork Sponsors SkillsUSA New Mexico Leadership and Skills Conference
April 17, 2025
The Jaynes Way: A University of New Mexico Children’s Hospital Project Retrospective
April 11, 2025
Jaynes Superintendent Tim O’Rear Retires After Six Decades
March 27, 2025
The Impact of Jaynes’ 100% Employee Ownership on Jaynes’ Employees (And Customers)
March 13, 2025
The Impact of Jaynes’ 100% Employee Ownership on Customers
March 11, 2025
Project Spotlight: Farolito Senior Community and YDI’s YouthBuild
March 7, 2025
MEA’s Rising Circle Ranch In Santa Fe Trusts Jaynes Millwork For Historically Sensitive Remodel
March 4, 2025
Jaynes Employee Spotlight: USCG Veteran Jimmy Beck Credits Military Experience To Recruiting Success at Jaynes
February 7, 2025
Jaynes Project Spotlight: The Pueblo of Sandia Opens Fire Station 39
December 9, 2024
Where Construction and Community Intersect: Los Altos Softball Complex Voted Nation’s Best Of 2024
November 13, 2024
Safety Brings You Home
May 22, 2024
Albuquerque Sunport Transformation
April 25, 2024
A Symbol of Our Values
December 31, 2022
New Santa Fe County Building is Ready to Go
October 18, 2019
A Pioneer in the Field: Jaynes’ Linda Squires And The Path She Forged
Jaynes Safety Nationally Recognized

Operating in the southwest

Eighty years is more than a milestone. It’s a testament to the resilience and craftsmanship of generations of Jaynes employees. It’s also a testament to the Jaynes community in the Southwest. Since 1946, Jaynes has built more than structures; we’ve built schools where futures begin, hospitals where healing takes place, and workplaces that drive innovation. Most meaningfully, Jaynes has built lasting relationships with owners, communities, and each other. This defines the Jaynes Way.
2906 Broadway NE
Albuquerque, NM 87107
505.345.8598
505.345.8598
HR FAX
505.345.8598 / 505.908.3212
65 Mercado Street, Ste. 125

Durango, CO 81301
970.247.1831
970.247.0338
HR FAX
505.998.0713 / 505.908.3212
1 County Road 3263,

Aztec, NM, 87410
505.326.3354
505.325.6399
HR FAX
505.998.0713 / 505.908.3212
505 S. Main St. Suite 132
Las Cruces, NM 88001
575.526.6400
575.526.1495
HR FAX
505.998.0713 / 505.908.3212
221 N. Kansas Street, Suite 700
El Paso, Texas 79901
505.345.8591
575.526.1495
HR FAX
505.998.0713 / 505.908.3212
Albuquerque
Durango
Aztec
Las Cruces
El Paso