CSV Sterile Processing Addition
The CVS Sterile Processing Addition project involves the construction of a 5,196 square foot, two-story building addition dedicated to establishing a sterile processing department adjacent to an existing surgical services building. The purpose of this addition is to ensure the efficient and safe sterilization of surgical instruments and equipment, a critical aspect of infection prevention and patient care standards. Meticulous planning encompasses not only the construction of new building sections but also the seamless integration with the existing structure.
Jaynes Structures, Inc. is self-performing concrete work, including trenching, excavation, and the installation of reinforcing steel. Additionally, casework installation for chapel wall protection further enhances the functionality and safety of the facility. By establishing a dedicated sterile processing department, the project not only prioritizes patient safety and care quality but also contributes to the overall well-being and trust of the community in healthcare services.
Job Details:
Owner:
Christus St. Vincent Regional Medical Center
Architect:
MEDesign Architectural Group